The underpass at Fontaniva was built using a box-jacking method: a concrete portal frame was cast beside the railway, on top of the retaining walls for the access ramps, then pushed beneath the live tracks with hydraulic jacks. Every hour of possession counts on a job like this.
That is where the speed of Ecobeton's system paid off. The rising walls and the slab - roughly 1,000 square metres - were waterproofed with Evercrete Vetrofluid, with Strutturale repair mortar used where reinstatement was needed, all in a single working day.


Project facts
- Location: Fontaniva (PD), Italy (2005) - approx. 1,000 m2
- Designer: Italferr SpA
- Contractor: Impresa Mattioli SpA (PD)
- Ecobeton solution: Waterproofing of rising walls and slab with Evercrete Vetrofluid and Strutturale
What this means for UK projects
Short possessions and tight programmes are the norm on Network Rail projects. A spray-applied treatment with no cure-before-traffic detailing is a genuine time saver. See Evercrete Vetrofluid.